Installation of the underfloor heating is a relatively easy thing to do and can be carried out by most experienced plumbers. The delay is waiting for screed to dry over the installed system, as this can take up to 70 days potentially before the system is turned on.

Marked as spam
Posted by Klima Technical (Questions: 36, Answers: 53)
Asked on 21st March 2019 11:01 am
18 views
Add comment
0
Private answer

Installation of the underfloor heating is a relatively easy thing to do and can be carried out by most experienced plumbers. The delay is waiting for screed to dry over the installed system, as this can take up to 70 days potentially before the system is turned on.

Marked as spam
Posted by Klima Technical (Questions: 36, Answers: 53)
Answered on 21st March 2019 3:40 pm